Wednesday, January 4, 2012

Weekly Construction Update: 1/4/2012

This week the following work is expected:
  • Installation of waterproofing in the shaft for the connector elevator
  • Pouring frames in the lower level
  • Ongoing excavation in the lower level
Next week the following work is expected:
  • Continued excavation in the lower level
  • Pouring frames in the lower level
  • Installation of shut-off valves for the existing radiant heat system

Wednesday, December 14, 2011

Weekly Construction Update: 12/14/2011

This week the following work is expected:
  • Begin to set columns in lower level
  • Frame concrete walls on north plaza
  • Begin to pour walls on north plaza (weather permitting)
  • Install reinforcing steel/rebar
Next week the following work is expected:
  • Continue to set columns in the lower level
  • Excavate the underpinning of elevator three
  • Continued installation of waterproofing
  • Frame and install reinforcing steel for elevator three
  • Strip newly poured and set concrete walls on north plaza
  • Backfill new walls