- Excavation on the lower level
- Installation of column footings on the lower level
- Concrete "cinder block" demolition on floors 2 - 4 and removal of concrete shaft
- Demolition of concrete elevator beams
- Inspection of exterior building overhang ceiling
- Insulation of building overhang ceiling and final preparation of ceiling before installation of soffit board (enclosure of ceiling)
- Replacement of problem pavers on the south plaza
Next week the following work is expected:
- Underpinning for west side plaza
- Continuation of concrete beam demo
- Continuation of concrete block elevator shaft removal
- Installation of soffit board on exterior building overhang ceiling (pending inspection)
- Pouring of concrete on the north building wall (external lower level)
- Waterproofing on the north building wall (external lower level)