New cooling tower pad and boiler flue pipe |
View of flue pipe from the south plaza |
Up-close view of flue pipe |
Detail structural work has been done on link addition roof |
Lower tier of north plaza. A slab of new concrete has been poured (covered section shown) |
New concrete slab on street level of north plaza. Will eventually be covered with granite pavers. Stairs and portion of water feature shown as well. |
Lower level wall framing, drywall, and door frames. |
Drywall, door frames, and ceiling progress in the lower level. |
Granite pavers in place on the upper tier of the north plaza. |