After a brief update hiatus, we are back to fill you in on all of the work that has been completed in our renovation project since mid-June.
Over the past three weeks the following work was completed:
Lower Level
· Taping and sanding of drywall in the lower level
· Work on the new water main
· First coat of paint in the lower level
· Pouring concrete pad for sprinkler pump
· Pouring concrete pad for house pump
· Tile floors and walls in lower level kitchen
· Delivery and installation of kitchen equipment
· Ongoing mechanical, electrical and plumbing work in the lower level ceiling
· Ongoing tiling work in lower level restroom
· Framing west of ramp (lower level)
Welcome Center
· Laying out walls in the Welcome Center (link addition)
· Building cinder block walls around elevator shaft
· Installation of top track
· Application of fire-proofing
· Installation of window frames
· Limestone work
· Mechanical, electrical and plumbing work
· Installation of storefront frames
· Framing walls
Plazas
· Duct work, lighting, drywall, and taping the building overhang/plaza ceiling
· Installation of limestone on all sides of east plaza wall
· Installation of limestone caps on east and upper plaza walls
· Filling hole in lower level north wall
· Placement of stair treads on plaza steps
This week the following work is scheduled to be completed:
· Continued work on the mechanical, electrical, and plumbing in the lower level ceiling grid
· Removal of the concrete wall by the existing elevator
· Removal of the ramp in the lower level
· New concrete work in the lower level
· Finishing-up installation of limestone caps on the east facing plaza wall
· Beginning installation of expansion joints on the plaza
· Backfilling excavated areas around future plaza planter and seating areas
· Sample pour of permeable concrete that will cover large portions of the north plaza
· Continued mechanical, electrical and plumbing work in the Welcome Center
· Installation of clearstory window frames in the Welcome Center
· Continued work on installing storefront and door frames in the Welcome Center
· Framing walls and soffits in the Welcome Center
· Installation of glass doors in current lobby/gallery space
No comments:
Post a Comment