- Complete the south storefront glass installation.
- Install granite caps on the wall that runs east/west.
- Install limestone on the wall that runs north/south.
- Install east stairs.
- Install hand rails.
The construction is targeted to move to the north side of the Plaza on or about 9/14/2011. Temporary directional signage will be posted at that time.