Friday, October 26, 2012

Construction In Pictures: Week of 10/22/2012

North plaza ramp retaining wall/planter with Welcome Center addition in background.

North plaza ramp wall

North plaza ramp wall

North plaza ramp walls in foreground, office building and Welcome Center addition in background

Cathedral new drain tiles (faint reddish pipes in dirt) and excavated Cathedral foundation wall

North plaza planter ready for plants

New office tower elevator door opening

Addition Verger room with millwork installation in process

Restroom wall cover

Restroom wall cover detail

Restroom wall cover and changing station shown (welcome young families!)

Addition elevator

Preparation of floors for installation of tile in the Welcome Center addition

Laundry room millwork

Laundry room millwork

Lower level hall closet

Installation of doors in the Great Hall at bottom of east side stairwell

Weekly Construction Update: 10/26/2012

This week the following work was expected:

·         Ongoing preparation of floors for tiling in the Welcome Center
·         Begin tiling Welcome Center floor
·         Installation of southeast window in the Welcome Center
·         Ongoing mechanical, electrical, and plumbing work in the Welcome Center ceiling
·         Installation of tile in the Working Sacristy
·         Installation of ceiling tiles in the Welcome Center
·         Installation of Welcome Center storefront
·         Finishing-up drywall installation in the Lower Level
·         Installation of millwork in the Lower Level Laundry Room
·         Plumbing work in the Lower Level Laundry Room
·         Continued drywalling and painting in the Office Tower around the elevator construction area
·         Installation of doors and hardware in the west Office Tower hallways
·         Frame and pour the east ramp retaining wall (north plaza)
·         Backfill with gravel around east ramp retaining wall

Next week the following work is expected:
·         Painting in the Office Tower west offices
·         Carpet installation in the west offices
·         Ongoing  installation of the Office Tower elevator
·         Continued framing and hanging drywall in the elevator lobbies on each floor
·         Work on the ceiling around the elevators
·         Ongoing preparation of floors for tiling in the Welcome Center
·         Ongoing tiling of the Welcome Center floor
·         Installation and wiring of loading dock gates
·         Installation of wall covering in the Welcome Center
·         Installation of millwork in the acolyte room
·         Final floor tiling in the lower level
·         Installation of door frame in the lower level
·         Painting the stairwell leading from the lower level/Great Hall to the current lobby
·         Clear equipment etc. from Burrill Hall to allow floor to be prepped for carpeting
·         Continued backfilling in east ramp
·         Shotcrete and waterproofing of the Cathedral foundation wall (East wall along North plaza)
·       Exterior cleaning of Office Tower

*The sidewalk on Huron will be closed through 11/9/2012. Be prepared to seek alternate routes to enter the office building* 

Friday, October 19, 2012

Weekly Construction Update: 10/19/2012

This week the following work is expected:
·         Hanging and taping drywall in the addition/Welcome Center
·         Prepping floors for tiling in the Welcome Center
·         Cleaning of limestone in the Addition/Welcome Center
·         Mechanical, electrical, and plumbing work in the Welcome Center ceiling
·         Hanging and taping drywall in the Lower Level
·         Various tiling in the Lower Level
·         Replacement of Rush and Huron sidewalks adjacent to the North Plaza
·         Installation of elevator doors on all floors in the Office Tower
·         Framing, hanging, and taping drywall in west Office Tower hallways
·         Painting in the Office Tower around the elevator construction area
·         Installation of ceiling tiles in the west Office Tower hallways

Next week the following work is expected:
·         Ongoing preparation of floors for tiling in the Welcome Center
·         Installation of southeast window in the Welcome Center
·         Ongoing mechanical, electrical, and plumbing work in the Welcome Center ceiling
·         Installation of tile in the Working Sacristy
·         Installation of ceiling tiles in the Welcome Center
·         Installation of Welcome Center storefront
·         Begin tiling Welcome Center floor
·         Finishing-up drywall installation in the Lower Level
·         Installation of millwork in the Lower Level Laundry Room
·         Plumbing work in the Lower Level Laundry Room
·         Continued painting in the Office Tower around the elevator construction area
·         Installation of doors and hardware in the west Office Tower hallways

Sunday, October 14, 2012

Construction In Pictures: Week of 10/8/2012

New sidewalk install

New sidewalk install

New sidewalk install

New sidewalk install

North Plaza fountain and planter

North Plaza fountain and planter

North Plaza fountain and planter

Welcome Center addition exterior

Welcome Center interior (transition into Cathedral)


Welcome Center interior (transition into Cathedral)

Welcome Center interior (transition into the Cathedral)

Office building elevator

Office building elevator

Cathedral working sacristy

Cathedral working sacristy

Cathedral working sacristy

Welcome Center restroom - stalls

Welcome Center restroom - sinks

Welcome Center restroom sinks, counter.

Welcome Center restroom stalls

Lower level stairs tile work

Lower level stair tiling

Lower level coat room area

Lower level - meeting room

Lower level meeting room detail
Building access as of 10/22/2012 - building staff, Cathedral parishioners, and visitors, please take note.

Weekly Construction Update: 10/14/2012

This week the following work was expected:
·         CMU/cinder block wall patching around elevator doors
·         Reworking lights in and around west offices
·         Tile installation in the laundry room (lower level)
·         Installation of millwork (cabinetry, etc) in the laundry room (lower level)
·         Continued installation of ceiling tiles in the lower level
·          Continued clearing out Great Hall area to prepare for finishing
·         Installation of ceiling tiles in the Welcome Center
·         Construction of a temporary wall in the Welcome Center to separate construction site from Cathedral
·         Continued sidewalk replacement along Rush and Huron including replacement of curbs, adjustment of utility covers, and begin pouring concrete slabs.

Next week the following work is expected:
·         Installation of elevator doors
·         Continued tiling in the laundry room (lower level)
·         Continued Installation of millwork in the laundry room
·         Final painting of doors and frames in the lower level
·         Installation of miscellaneous hardware in the lower level
·         Installation of a handrail on lower level stairs
·         Continued installation of Welcome Center ceiling
·         Installation of sprinkler system and lights in the Welcome Center
·         Continued construction of the temporary wall between the construction area and Cathedral
·         Continued sidewalk replacement along Rush and Huron

Note: see map indicating modified building access to begin Mon. 10/22.

Friday, October 5, 2012

Weekly Construction Update: 10/5/2012

This week the following work was expected:
·         Continued work on the Welcome Center ceiling
·         Installation of Welcome Center restroom fixtures
·         Mechanical, electrical and plumbing installation trim
·         Begin installation of ceiling tiles in the Welcome Center
·         Begin installation of floor tiles on the west side of the lower level
·         Installation of lights in the Great Hall area (formerly Burrill Hall) of the lower level
·         Installation of ceiling tiles in the lower level
·         Installation of millwork in the Working Sacristy
·         Begin installation of ceiling tiles in the Working Sacristy
·         Continued work on the installation of the elevator in the office tower building
·         Continued work on the ceiling grid in the west offices
·         Continued work on the lights in the west offices
·         Continued work on the HVAC in the west offices
·         Begin installation of ceiling tiles in the west offices
·         Continued sidewalk replacement along Rush and Huron

Next week the following work is expected:
·         CMU/cinder block wall patching around elevator doors
·         Installation of ceiling tiles in the west offices
·         Framing and hanging drywall in the hallways near the elevator and west offices
·         Tile installation in the laundry room (lower level)
·         Installation of millwork (cabinetry, etc) in the laundry room (lower level)
·         Continued installation of ceiling tiles in the lower level
·         Begin clearing out Great Hall area to prepare for finishing
·         Installation of ceiling tiles in the Welcome Center
·         Continued sidewalk replacement along Rush and Huron