Friday, November 9, 2012

Weekly Construction Update: 11/9/2012

This week the following work was expected:
·         Ongoing floor tile in the Welcome Center
·         Installation of handrails in stairwell to lower level in the addition
·         Installation of doors and hardware in the Welcome Center
·         Ongoing painting in the Great Hall and other lower level spaces
·         Preparation of floor in the Great Hall for carpeting
·         Begin installation of carpet squares in the Great Hall
·         Installation of handrails at other lower level stairs
·         Installation of doors and hardware in the lower level
·         Pouring stairs to the lower level from the north plaza
·         Pouring the west sidewalk (from the Huron Street sidewalk to the lower level door on the plaza)
·         Pouring the Labyrinth base
·         Finish pouring the plaza ramp concrete
·         Pouring bench piers and sign foundation on the north plaza
·         Stone and soil backfill on the north plaza
·         Final sidewalk and curb demolition
·         Placing soil and trees around the labyrinth area
·         Frame and pour the labyrinth
·         Ongoing elevator work in office tower
·         Continued work on the ceiling grid in the office tower west offices
·         Reworking mechanical, electrical, and plumbing in some west office areas
·         Finish drop ceiling installation and painting in the west offices
·         Ongoing exterior cleaning of Office Tower

Next week the following work is expected:
·         Installation of Welcome Center storefront doors
·         Begin carpeting of the west offices
·         Final floor tile in the Welcome Center
·         Final painting in the Welcome Center
·         Installation of carpet in some Welcome Center areas
·         Begin cleaning the Welcome Center
·         Ongoing installation of carpet tiles in the Great Hall (lower level)
·         Cleaning in the Great Hall and lower level renovated areas
·         Grinding streets and laying new asphalt on Rush and Huron as required by the City of Chicago
·         Continued carpeting in the west offices of the office tower
·         Ongoing exterior cleaning of Office Tower