Weekly Construction Update: 5/9/2012
This week the following work is expected:
- Installation of rebar and concrete block wall in the west offices, floors 2 - 5 of the office tower
- Installation work for ceiling lights in the lower level
- Installation of more steel in the SW section link area
- Setting limestone - north plaza
Next week the following work is expected:
- Continued work on installing concrete block walls in the west offices, floors 2 - 5 of the office tower
- Begin to drywall ceilings in the lower level
- Begin roofing the link structure
- Placing limestone end caps on the north plaza walls
- Preparing surface for new concrete slabs to be poured on the lower level of the north plaza