This week the following work is expected:
- Installation of Lower level column footings. This will provide structural support to the builing.
 
- Demolition of concrete beams in elevator shaft.
 
- Removal of radiant pipes from the ceilings of vacant workspaces surrounding elevator shaft construction.
 
- Continued waterproofing on lower level exterior.
 
Next week the following work is expected:
- Continued installation of lower level column footings.
 
- Continued concrete demolition in the elevator shaft.
 
- Relocation of elevator shaft risers.
 
- Continued removal of radiant pipes from the ceilings of the vacant workspaces around the elevator shaft.
 
- Concrete footings on the north plaza will be back-filled and poured.
 
 