Friday, August 3, 2012

Construction In Pictures: Week of 7/30/2012

Stairs from lower level to Welcome Center/St. James Cathedral

Stairs from lower level to Welcome Center/St. James Cathedral

Installation of west stairs on North Plaza

Installation of pavers on North Plaza

Installation of pavers on North Plaza

Installation of pavers on North Plaza

HVAC duct

Main entrance to Welcome Center

Welcome Center elevator install begins

Permeable concrete

Lower level bathroom tile install

Lower level bathroom tile install

Lower level bathroom tile install

Ceiling tiles in lower level

Ceiling tiles in lower level

No comments:

Post a Comment