Wednesday, January 4, 2012

Weekly Construction Update: 1/4/2012

This week the following work is expected:
  • Installation of waterproofing in the shaft for the connector elevator
  • Pouring frames in the lower level
  • Ongoing excavation in the lower level
Next week the following work is expected:
  • Continued excavation in the lower level
  • Pouring frames in the lower level
  • Installation of shut-off valves for the existing radiant heat system

No comments: