Wednesday, November 16, 2011

Weekly Construction Update: 11/16/2011

This week the following work is expected:
  • Excavation on the lower level
  • Installation of column footings on the lower level
  • Concrete "cinder block" demolition on floors 2 - 4 and removal of concrete shaft
  • Demolition of concrete elevator beams
  • Inspection of exterior building overhang ceiling
  • Insulation of building overhang ceiling and final preparation of ceiling before installation of soffit board (enclosure of ceiling)
  • Replacement of problem pavers on the south plaza

Next week the following work is expected:
  • Underpinning for west side plaza
  • Continuation of concrete beam demo
  • Continuation of concrete block elevator shaft removal
  • Installation of soffit board on exterior building overhang ceiling (pending inspection)
  • Pouring of concrete on the north building wall (external lower level)
  • Waterproofing on the north building wall (external lower level)