Wednesday, April 25, 2012

Construction In Pictures: Week of 4/23/2012

New cooling tower pad and boiler flue pipe

View of flue pipe from the south plaza

Up-close view of flue pipe

Detail structural work has been done on link addition roof

Lower tier of north plaza. A slab of new concrete has been poured (covered section shown)

New concrete slab on street level of north plaza. Will eventually be covered with granite pavers. Stairs and portion of water feature shown as well. 

Lower level wall framing, drywall, and door frames.

Drywall, door frames, and ceiling progress in the lower level.

Granite pavers in place on the upper tier of the north plaza.