Wednesday, December 5, 2012

Construction In Pictures: Week of 12/3/2012

South side of building exterior during cleaning and polishing

North plaza water feature light

North plaza ramp paver cap installation

Return of the Peace Angel!

The Peace Angel returns to the property in the bed of a truck

The Peace Angel is lowered onto it's new platform at the northwest plane of the back of the Cathedral and facing the new labyrinth and North Plaza

Peace Angel installed

Sidewalk parkway planting - preparing the soil

Preparing the soil for plantings in the sidewalk parkway along Rush. Huron street parkways have been planted as well.

Sidewalk parkway planting
Preparing for the Welcome Center reception area cross to be installed

Installation of the Welcome Center vestibule flooring

North Plaza Welcome Center entrance

The new entrance to the Saint James Commons Welcome Center!

North plaza ramp area with plantings

North Plaza ramp area with plantings

North Plaza ramp area plantings